Cut and prepare the pipe according to the length of the line in advance, install the pipe on the cable, and wrap the part to be protected tightly. During the installation of snap on insulating sheath, the line of the construction part needs to be cut off to ensure personal safety.
matters needing attention:
Cut and prepare the pipe according to the length of the line in advance, cut off the line of the construction part, precoat the inner wall of the pipe with the glue provided with the goods, and fix it with the accessories provided with the goods at a distance of about 1 meter.